Uro Pump Irrigation System

Reliable Irrigation Control for Urological Procedures

 

 

Precision Irrigation for Urological Procedures

UroPump

The Bukhari Medical Uro Pump is an advanced irrigation system designed to deliver controlled and continuous fluid management during urological procedures. Engineered to support clear surgical visibility, stable pressure control, and efficient workflow, it helps healthcare professionals perform with greater confidence and precision. With reliable performance, low-noise operation, and a user-focused design, the Bukhari Medical Uro Pump is a dependable solution for modern endourology.

Safety Guidelines

  • Always use the UroPump Administration Set recommended by Bukhari Medical. Incompatible tubing may affect pump performance and flow accuracy.

  • Ensure the tubing is properly primed before use to help prevent air entry into the system.

  • Do not connect or disconnect the tubing while the pump is powered on.

 

  • Follow the recommended operating instructions for safe and reliable system performance.

Performance Highlights

Advantages for surgeons

1_

Lightweight Design

Compact and lightweight construction supports easy handling and convenient positioning in the operating room.

2_

Low Noise Operation

Low-noise performance helps maintain a quieter and more focused operating environment during procedures.

3 _

Accurate Pressure Control

An integrated pressure sensing system helps maintain stable and accurate irrigation control during urological procedures.

4 _

Continuous Irrigation

Continuous fluid delivery supports consistent irrigation and helps maintain clear surgical visibility throughout the procedure.

UroPump Irrigation Pump

Step-by-Step Connection Process

Prepare the Pump

Ensure the UroPump is placed on a stable, level surface near the patient. Make sure the main power is off.

Spike the Irrigation Bags

Hang the two irrigation fluid bags on the IV poles.
· Remove the protective cap from the first irrigation bag.
· Take the Y-connector end of the UroPump Administration Set. You will see two separate spikes.
· Firmly insert one spike into the first irrigation bag.
· Repeat the process with the second spike for the second irrigation bag.
· This Y-connection allows the pump to draw fluid from both bags simultaneously or sequentially, ensuring a continuous flow.

Prime the Tubing

Locate the drip chamber on the administration set. Squeeze it gently until it is about half-full with the irrigation fluid.
· Slowly open the flow regulator (the roller clamp) and allow the fluid to run through the entire length of the tubing. This step is critical to remove all air bubbles, preventing air from entering the system.
· Once the tubing is primed, close the roller clamp to stop the flow.

Load the Tubing into the Pump

Open the pump’s tubing compartment door. You will see a designated path for the tubing.
· Place the specific section of the tubing into the pump’s peristaltic mechanism, following the guides or arrows marked on the pump. Ensure the tubing is seated correctly and securely.
· Close and latch the compartment door.

Connect to the Patient

· The distal end of the tubing (with the Luer-lock connector) is now ready to be connected to the patient’s catheter or cystoscope irrigation port using aseptic technique.

TREATMENTS PERFORMED

Applications

 

UroPump Covers The Following treatments

Urology

TURP Procedures | Bladder Tumor Resection | Stone Management | Prostate Surgery | Endoscopic Urology

 

Device Information Request

Please complete our contact form to inquire about our cutting-edge medical device. We value your pursuit of medical knowledge and innovation, and we’re here to provide the information you need.